GEDA construction waste chute

price for
One day7 days20 days30 days
Initial module
7.404.443.552.96
Conical module
4.302.582.061.72
Floor branch
9.535.724.573.81
Protective sheet metal
0.670.400.320.27
Scaffold attachment
1.671.000.080.67
Fixing for a skirting board
7.244.883.262.90
Prices per day in BGN without VAT for a period

Technical specification

Product code199111991019912199131991419915
ComponentInitial moduleconical modulefloor branchprotective sheet metalscaffolding attachmentskirting board attachment
Working length, m-1.00-0,80--
Transport length, m-1,10-0,80--

Construction waste chutes, also called garbage pipes, are designed for transporting materials from the upper floors of sites during construction and repair activities. Each of the modules (pipes) are connected by means of metal chains, with the possibility of placing floor branches.

The standard package includes a metal stand for attachment to a scaffold, a starting element for dumping the waste – type of funnel and the required number of conical elements - pipes.

The price is determined by the length of the formed chute and the rental period.

Quick inquiry - GEDA construction waste chute

Invalid validation code.

All fields are required.

You have used invalid characters. Please correct the text in the field shown.

Thank you for your inquiry! We will contact you very soon.

GEDA construction waste chute was added to your cart!
0700-1-9988
Quick inquiry