A combination of Allround and facade scaffolding
For their site in Darvenitsa district, our regular client Feribuild EOOD turned to us to have the facade of their new site scaffolded. An interesting challenge on this site was the fact that the overall scaffolding of the facade required the combined use of the two types of
scaffolding Layher Speedy Scaf and
AllRound.
In order to level the terraces, we used 6.00 m. towers built by
AllRound. With these towers we were able to make the stepping on the facade scaffolding coming from the terraces. There was nothing unusual about anchoring.
The installation and dismantling of the scaffolding is carried out by employees of the tenant company. Our representative was available at all times to advise the customer.